You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
bug: naming a closed project with --project and --include-completed returns nothing, because the fold still applies #253
Since #252, today --include-completed and anytime --include-completed fold a to-do closed inside a closed project into the project row, as logbook does. The fold is unconditional, so it also applies when I have named that closed project explicitly: things today --project "Launch v2" --include-completed returns an empty list, because every closed child is folded and a project row never matches on the parent join. The bare things --project <uuid> form works, and everywhere else in the code naming a closed project lifts the fold (closedProjectContents, show --agent).
Expected
An explicit --project naming a closed project lifts the fold on the --include-completed variants too, matching the rest of the CLI. This means plumbing the filter into the view's WHERE builder, which #240 is about to restructure, so do it after #240 lands.
Activity