Repository navigation
ci: build upgraded modules on JDK 21 - #4
Open
devin-ai-integration[bot] wants to merge 1 commit into
Open
devin-ai-integration[bot] wants to merge 1 commit into
devin-ai-integration[bot] wants to merge 1 commit into
Conversation
Co-Authored-By: Devin AI <158243242+devin-ai-integration[bot]@users.noreply.github.com>
Author
🤖 Devin AI EngineerI'll be helping with this pull request! Here's what you should know: ✅ I will automatically:
Note: I can only respond to comments from users who have write access to this repository. ⚙️ Control Options:
|
Author
There was a problem hiding this comment.
🔍 Devin Review: 1 flag
Not posted on this PR by your GitHub settings — view it in Devin Review. (Configure)
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Adds
.github/workflows/build.ymlso the upgrade loop closes with a visible green check: on every PR and push tomain, a matrix job runsmvn -B clean packageon Temurin JDK 21 (with Maven cache) in each upgraded module. The matrix here is[track]only; #5 (stacked on this branch) addsshippingalongside its upgrade so the check is green from the moment the module lands. Modules still on Java 8 are deliberately left out — they would fail on JDK 21 (the sameNoSuchFieldErrorbaseline shown in #1) until upgraded.Verified:
build (track)passed on this PR.Link to Devin session: https://app.devin.ai/sessions/521876ab29a141689f30f94bc447ace7
Open in Devin Desktop: https://app.devin.ai/desktop/session/521876ab29a141689f30f94bc447ace7?variant=devin
Requested by: @matth4922-droid