Skip to content

Testing: PR gate restructuring and main.yml (T-05) #339

Closed

Description

@jsam

Part of the test strategy (captain, 2026-10-05: scenarios that test the changes together; cleaner, faster suites; TESTING.md). Epic #305.

Scope. ci.yml: Tests job runs cargo test --workspace --all-features (now including scenarios), then scripts/run_snapshot_tests.sh --debug --affected <merge-base>, then prints the per-binary timing table; new JS SDK job (path filter adds ws-protocol/**, docs/spec/**, src/protocol/** to both SDK jobs); new .github/workflows/main.yml on push to main: full spec corpus, oracle 50 seeds, js-test-live, python-sdk-live, python-test-live, release e2e-reactive. run_snapshot_tests.sh --debug uses target/debug binaries.

Acceptance. A PR touching src/ finishes Tests in under 10 min wall on blacksmith-4vcpu; the three #290 specs fail the first main.yml run (then are fixed by #290); a PR touching only packages/inputlayer-js runs the JS job and nothing Rust.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions