You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Establish mandatory pre-PR performance and live streaming correctness gates, then expand deterministic quality and coverage. P00 is first; Q00 starts in R1 and expands through R3/R4. Operational quality work can proceed in parallel, while the LLM re-baseline remains deferred.
Keep this tracking issue open until its selected release scope passes. Child issues in a later milestone remain visibly deferred; a partial slice does not complete a broader issue. Every change runs the performance pipeline in #163 before a pull request.
Moved to the Engine production readiness milestone, the current focus (tracker #199). Perf and quality gates are part of production readiness: every engine PR runs the perf gate before it opens.
Roadmap per the neurosymbolic decision layer plan: engine production readiness first, then gateway neural integration with Jev, CLM and Laya (#266).
Activity
jsam commentedon Oct 4, 2026
Moved to the Engine production readiness milestone, the current focus (tracker #199). Perf and quality gates are part of production readiness: every engine PR runs the perf gate before it opens.
Roadmap per the neurosymbolic decision layer plan: engine production readiness first, then gateway neural integration with Jev, CLM and Laya (#266).
jsam commentedon Oct 10, 2026
Children #163, #179, #167, #88 and #44 are closed. #45 continues as the coverage issue below and inputlayer/inputlayer-symbolic#146 and inputlayer/inputlayer-symbolic#147 were moved to inputlayer-symbolic. Remaining work continues in https://github.com/inputlayer/inputlayer-symbolic/issues/124.