Skip to content

ci: stage isolated policy Go 1.27.2 floor - #1064

Merged
intel352 merged 1 commit into
mainfrom
fix/ci-go127-policy-floor-stage
Oct 14, 2026
Merged

intel352 merged 1 commit into
mainfrom
fix/ci-go127-policy-floor-stage

Conversation

@intel352

Copy link
Copy Markdown
Contributor

The seven workflow compiler contexts have completed their separate Go 1.27.2 transition in PR1063. This stages the final isolated policy-module floor change without adopting or promoting it.

Only .github/public-workflow-authority.json changes. The active 38-file bundle remains exact. The staged 38-file bundle keeps the same ordered membership and changes exactly two hashes: policytool/go.mod for go 1.26.5 to go 1.27.2, and the wrapper hash resulting from that embedded module-hash update. The module, wrapper, sum, immutable guard, executable trust rows, workflows and every other source file remain unchanged. The staged future source is intentionally unrealized; adoption and promotion remain separate Tasks24 and25.

Validation: all 3,530 source files and modes were frozen against accepted main b0195f9, including the 62 owning predecessor inputs. Actual Go1.27.2/local native checks passed the trusted stage, nonzero first adoption scan, unchanged guard exact authorization marker, authorized candidate self-scan, ordinary promotion scan, 12 refusal/rollback controls, unchanged full policy fixture harness, vet, actionlint and compatible official golangci-lint2.14.0 for the isolated policy module. A process-level shared-cache sandbox failure is preserved alongside the successful approval-reviewed rerun; no cache or source permissions changed.

Hosted exact-head CI, security, protections and snapshot/main acceptance remain separate gates. The prior incomplete OSV result and its findings are not claimed fixed or clean; benchmark failures remain advisory under B14, with no performance credit. Release/dependency-update runtime remains config-only until natural events. SourcePR1022, stable CLI publication and Compute runtime acceptance remain separate.

Locked plan: Task23, docs/plans/2026-10-04-workflow-go127-ci.md; 29 task/PR identities and all scope locks are unchanged.

@intel352
intel352 merged commit 48e72f0 into main Oct 14, 2026
23 of 24 checks passed
@intel352
intel352 deleted the fix/ci-go127-policy-floor-stage branch October 14, 2026 21:55
@intel352
intel352 restored the fix/ci-go127-policy-floor-stage branch October 14, 2026 21:55
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant