Skip to content

ci: promote complete Go 1.27.2 workflow wave - #1063

Merged
intel352 merged 1 commit into
mainfrom
fix/ci-go127-wave-promote
Oct 14, 2026
Merged

intel352 merged 1 commit into
mainfrom
fix/ci-go127-wave-promote

Conversation

@intel352

Copy link
Copy Markdown
Contributor

Promote the complete six-workflow Go 1.27.2 wave already realized by accepted main e79ac94: CI (including Go Tests), benchmark, CodeQL, dependency-update, pre-release and release. Only P/E/C/A change: 6 presence, 4 executable, 193 command and 42 action rows move from staged to active; only obsolete predecessor rows are removed. Retained row identities, metadata and order stay exact. All 3,526 non-owning source blobs and modes, six workflow YAMLs, authority inventory and isolated Go 1.26.5 floor remain unchanged.

Actual Go 1.27.2 validation passed: trusted six-group scan and independent frozen promotion consumer; complete stage/adopt/promote pairs; all 18 omitted-group controls (generic classifier accepts, owning complete-group gate refuses); three actual mixed-wave refusals; core count1; unchanged full core/guard/fixture harness; vet; and actionlint. The existing repository harness passed in 392.925s, including guard 356.946s. The additional agent-selected four-minute guard cutoff failed and remains recorded; it was not retried or used to change any repository source, test deadline or cache configuration. Both independent source reviews bind this exact tree and body before publication.

Scope manifest: PR Count 29; Tasks 29. This PR is grouping row 22, Task 12, branch fix/ci-go127-wave-promote. The other task boundaries remain separate. Doc-reconciliation: not applicable (four policy maps only).

Actual owning PR Linux native153/eight/all18, Go Tests/Actions15368, applicable security/protected checks, immediate-main and snapshot evidence remain mandatory before Task12 acceptance. Existing incomplete strict OSV findings and advisory benchmark failures or NOT RUN remain visible; no security-clean, performance, stable-CLI or Compute-runtime acceptance is claimed. The isolated policy floor stages23–25 and sourcePR1022 retain their separate prerequisites.

@intel352
intel352 merged commit b0195f9 into main Oct 14, 2026
23 of 24 checks passed
@intel352
intel352 deleted the fix/ci-go127-wave-promote branch October 14, 2026 19:56
@intel352
intel352 restored the fix/ci-go127-wave-promote branch October 14, 2026 19:56
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant